The Huron is a 6-story residential building with one level of underground parking that is developed by Starlight Investments and managed by LCL Builds. Aura-Con performed bulk and detailed footing excavation for the underground parkade. Hauled all excess material off site to a designated fill site and stockpiled backfill material on site. Placed and graded all granular material for the slab on grade. Completed all backfill and compaction after the foundation walls were completed. Aura-Con also assisted the site servicing company with required excavation and worked hand in hand with the forming company to complete the project with an aggressive schedule.