In certain projects where deep excavation is required, installation of an earth retention system is inevitable.
Aura-Con is equipped and has extensive experience in design & installation of earth retention systems. We always strive for the most effective and efficient earth retention system design possible.
One of the commonly used earth retention systems is Soldier Piles & Lagging. Construction of this system consists of vertical drilling or driving of steel beams into the earth followed by installation of lagging boards between the beams. Furthermore, drilling and grouting of tiebacks, installation of walers, rakers and struts may also be necessary to further stabilize the system.